DOWNLOAD UNDERGRADUATE, POSTGRADUATE AND FINAL YEAR RESEARCH PROJECT TOPICS AND MATERIALS, FIND  AND DOWNLOAD FREE PROJECT TOPICS AND MATERIALS PDF AND MS WORD, LIST OF SCHOOL PROJECT TOPICS AND MATERIALS FOR ALL DEPARTMENTS AVAILABLE HERE. LOOKING FOR HOW TO WRITE A PROJECT, WHERE TO DOWNLOAD PROJECT MATERIALS, FIND COMPLETE PROJECT MATERIAL CHAPTER 1 TO 5 OR HIRE A PROFESSIONAL RESEARCH WRITER? CALL OUR CUSTOMER CARE +234 806 418 2657, WHATSAPP VIA +234 816 757 4565
TELEPHONE HOTLINE: +234 81 67 574 565, +234 80 64 182 657, EMAIL: Info@eliteproject.com.ng

ENVIRONMENTAL FACTORS INFLUENCING CONSTRUCTION TIME AND COST OVERRUNS ON HIGH-RISE PROJECT IN NIGERIA

COMPLETE SCHOOL PROJECT TOPICS & MATERIALS :
CHAPTERS:
Chapter 1-5 | DOC FORMAT: MS WORD/PDF | PRICE: ₦5,000

                                                           CHAPTER ONE

                                                          

                                                          INTRODUCTION

 

 

 

 

 

1.0         Background of the study

 

The expanding need for building of all kinds, coupled with a tight financial supply has offer  the construction industry with a large challenge to cut cost.

 

According to Mendelson and Greenfield (1996) the remaining part of the twentieth century would involve corporations, institutions and government in a race to survive. The attendant dwindling economic fortune of countries economies around the globe have geared up the respondent  in these sectors (the client in particular) to take up the problem of ensuring efficient use of their resources to obtain value for money in terms of performance.

 

The total cost of construction in normal circumstances is expected to be the sum of the following cost: Materials, Labour, Site Overheads, Equipment/Plant, Head office Cost and Profit but in many parts of the world particularly in Nigeria, there are other costs to be allowed for. These costs according to Mbachu and Nkado (2004) have obvious negative effect for the key business stakeholders in particular, and the industry as a whole. To the client, high cost  implies added costs over and above those initially agreed upon at the onset, resulting in  less returns on investment. To the end user, the added costs are passed on as higher rental / lease costs or prices. To the consultants, it means inability to deliver value – for – money and could tarnish their reputation and result in loss of confidence reposed in them  by  clients.     To  the  contractor,  it implies      loss  of  profit through  penalties for non-completion, and negative word of mouth that could jeopardize his/her chances of winning further jobs, if at fault. The proposed work will investigate and report the other costs to be allowed for, which are the basic factors affecting construction cost in Nigeria and also proffer solutions to how construction cost can be minimized.

 

1.1                 Statement of the Problem

 

The demand for more construction of all types, coupled with a tight monetary supply has provided the construction industry with a big challenge to cut costs. The problem of high contract costs of all aspects of construction is becoming obvious. Consequently, substantial increases are being observed in projects.

 

This substantial increase has brought about loss of client confidence in consultants, added investment risks, inability to deliver value to clients, and disinvestment in the construction industry.

 

 

1.2         Aim and Objectives of the study

 

The aim of the study is to find out the factors affecting construction cost in Nigeria and proffer solutions to how construction cost c an be minimized. The objectives of the study are as follows:

 

  1. To identify the main factors affecting construction cost in Nigeria.

 

  1. To determine the severity rank of the factors amongst clients, consultants and contractors.

 

  1. To determine the agreement ranking factors between clients, consultants and contractors.

 

  1. To proffer solutions on how to minimize construction cost in Nigeria.

1.3         Research Hypotheses

 

To test the hypothesis:

 

1 (a). Ho: Contractors and Clients do not generally agree on the severity rank of the

 

factors    affecting construction cost in Nigeria

 

1 (b). H1: Contractors and Clients generally agree on the severity rank of the factors

 

affecting construction cost in Nigeria

 

2 (a). Ho: Clients and Consultants do not generally agree on the severity rank of the

 

factors affecting construction cost in Nigeria

 

  1. (b) H1: Clients and Consultants do not generally agree on the severity rank of the

 

factors    affecting construction cost in Nigeria

 

  1. (a) Ho: Consultants and Contractors do not generally agree on the severity rank of the factors affecting construction cost in Nigeria

 

  1. (b) H1: Consultants and Contractors generally agree on the severity rank of the factors affecting construction cost in Nigeria

 

1.4         Significance of the study

 

An assessment of the study would enable Clients, Contractors and Consultants give an economic approach to construction work such that they would be able to identify the dominating factors leading to high construction cost in Nigeria.

 

The application of the solutions proffered to minimizing construction cost would restore client’s confidence in consultants, reduce investment risks, and generally boost the viability and sustainability of the industry.

1.5         Scope and Delimitations

 

The scope of this research is limited to identification of essential factors affecting construction cost and proffering solutions on how to reduce construction cost in Nigeria. The study is limited to projects in the Lagos metropolis of Nigeria because there is easy access of information in the Lagos metropolis by the researcher.

 

Target respondents for this study are the principal actors in the construction industry namely: the Client, the Consultant and the Contractor.

NEED SUPPORT?

TO SPEAK WITH OUR ONLINE CUSTOMER-CARE

BACK
error: Premium content
ELITE PROJECT TOPICS AND MATERALS POWERED BY NTECHY DIGITAL SYSTEM |Find & Download complete undergraduates & final year BSc,HND,OND Project topics and materials online.
PROJECT TOPICS AND MATERIALS IN NIGERIA, GHANA AND OTHER COUNTRIES