COMPLETE SCHOOL PROJECT TOPICS & MATERIALS :
CHAPTERS: Chapter 1-5
|
DOC FORMAT: MS WORD/PDF
|
PRICE: ₦5,000
ABSTRACT
In the past and present years now, there have been serious occurrences of fire outbreaks, each of which causes destruction of articles work millions of naira. In the past few months, there was fire outbreak in NITEL Exchange building at Apapa and Ikeja all in Lagos, destroyed materials estimated to be about N2.5 million.
These ugly situation of fire outbreak always result in frustration, instabilities and disconsolations to the individuals involved and the country at large.
It is therefore, on the recognition of this fact that we initiated the idea of constructing the fire alarm system, which is to alert the security men or fire service men in the event of any fire outbreak.
TABLE OF CONTENT
Title page
Approval page
Dedication
Acknowledgement
CHAPTER ONE ” INTRODUCTION
1.1 Background of problem
1.2 Structure of the problem
1.3 Objective of the study
1.4 Scope and limitation
1.5 Importance of the study
1.6 Definition of terms
1.7 Design of the system
1.8 Layout for the construction
CHAPTER TWO – CHARACTERISTICS OF THE COMPONENTS
2.1 5a fused, 3 pin pole plug
2.2 Isolation and switching
2.3 A.c. contactors
2.4 The electric bell
2.5 Fire/temperature detectors
2.6 Connectors
2.7 Flexible cord
2.8 Display/control cabinet
2.9 Incandescent lamp
2.10 Lamp holder
CHAPTER THREE – CONSTRUCTION
3.1 Construction of the display and control unit
3.2 Assemblage of the components
3.3 Problems encountered, during the constructions
CHAPTER FOUR – OPERATIONAL DESCRIPTION
4.1 Operation of the unit
4.2 Monitoring/installation
CHAPTER FIVE – FAULT-FINDING AND PRECAUTION
5.1 Fault-finding or trouble-shooting
5.2 Safety precaution
Conclusion
References
Bill of quantity